SEWAGE DEPARTMENT TRAINING PROGRAM
How to Repair an Elevated Sandmound
6. Replace the upper layer of aggregate. The aggregate must be a minimum of 2 inches above the piping.
Side view showing upper aggregate in place
A typical mound with the piping in place. Aggregate to cover the piping has been stored between the laterals. Lateral cleanouts (usually optional) have been installed on this system.