SEWAGE DEPARTMENT TRAINING PROGRAM

How to Repair an Elevated Sandmound

 

6.  Replace the upper layer of aggregate.  The aggregate must be a minimum of 2 inches above the piping.

 

Side view showing upper aggregate in place

 

A typical mound with the piping in place.  Aggregate to cover the piping has been stored between the laterals.  Lateral cleanouts (usually optional) have been installed on this system.

 

BACK     NEXT

 

Back to Program Index

Back to Home Page